# Greenwave Systems v.2.0 removed power capabilities

**URL:** <https://community.homey.app/t/greenwave-systems-v-2-0-removed-power-capabilities/6195>\
**Category:** Apps\
**Created:** [January 2, 2019, 4:34pm UTC](https://community.homey.app/t/greenwave-systems-v-2-0-removed-power-capabilities/6195 "2019-01-02T16:34:14Z")\
**Posts on this page:** 1\
**Showing post:** 120

<div class="post-metadata">

**Author:** ![Rudi\_Hendrix](https://sea1.discourse-cdn.com/flex025/user_avatar/community.homey.app/rudi_hendrix/32/31931_2.png) [@Rudi\_Hendrix](https://community.homey.app/u/Rudi_Hendrix)\
**Post date:** [July 12, 2024, 9:30pm UTC](https://community.homey.app/t/greenwave-systems-v-2-0-removed-power-capabilities/6195/120 "2024-07-12T21:30:09Z")

</div>

I’m also looking for a solution for this. Not because I need the power measurements that bad. Just because time and again if I install one of the Greenwave Powernodes it holds on to the measurements at the time of installation. So it messes up my entire home measurements.

A while ago I managed to install the Tuya app using CLI. Still looking if someone can point me to a step by step guide on how to install this version 1.1.1 of Greenwave Systems on my Homey Pro.  
Seems to be here… [[HOW TO] CLI install method - Tutorials - Homey Community Forum](https://community.homey.app/t/how-to-cli-install-method/198)  
Now I only need to find the 1.1.1 as it is not in the Github repository anymore.

Ok, even though I read the whole thread I wasn’t paying attention. Found it and installed it.

Now I have my power measurements back again. Can I exclude the “overall” power measurement from Homey?  
Because currently it holds the power of PN1 as PN1 AND as total of the power node. So for example on one of them currently I have the following:  
Overall 52,3 Watt  
PN1 52,3 Watt  
PN2 25,2 Watt  
PN3 1,1 Watt  
PN4 15,9 Watt  
PN5 41,9 Watt  
PN6 39 Watt

And Homey shows a total of 227.7 Watt whereas this should be 175,4 Watt

---

_[View the full topic](https://community.homey.app/t/greenwave-systems-v-2-0-removed-power-capabilities/6195)._
